Heavy-Duty Horizontal Glass Washing System with Multi-Stage Purification for Industrial Glass Production Lines

Customization: Available
After-sales Service: 24 Hours Online
Warranty: 1 Year

Product Description

Basic Information
Condition
New
Certification
CE
Automatic Grade
Automatic
CNC or Not
not CNC
Voltage
380V
Transport Package
Wooden Box
Specification
2800mmx1600mmx900mm
Trademark
Ranling
Origin
Shandong
HS Code
8461500090
Production Capacity
100%
Product Description
Heavy-Duty Horizontal Glass Washing System
Industrial Glass Production Line 1 Industrial Glass Production Line 2
Product Specification
Applicable IndustriesBuilding Material Shops, Food & Beverage Factory, Food Shop, Garment Shops, HOME USE
Video outgoing-inspectionProvided
Machinery Test Reportcustom
Warranty of core components1 YEAR
Core ComponentsPLC, engine
Weight1600kg
Power8kw
Applicable MaterialPVC, UPVC, Aluminum
Key Selling PointsEasy to Operate
Dimension (L*W*H)2800mmx1600mmx900mm
Company Profile
Production Workshop Equipment Display
Founded in 2011, we are a manufacturer specializing in the research development and production of CNC Aluminum profile making machines for windows and doors curtain wall such as double saw machines, heavy-duty angle machines, hinge drilling machines etc. After years of development, we have developed into a modern high-tech enterprise of laser cutting machine, including fiber laser cutting machines for metal sheet pipe and laser welding/cleaning/cutting machines.
All the products are certificated by CE and comply with international quality standards and are greatly appreciated in a variety of different markets at home and at abroad.
Packaging & Shipping
Packaging and Logistics
Frequently Asked Questions
Are you a professional manufacturer?
Yes, we are a professional manufacturer with more than 16 years of experience in this specialized area.
What is the standard delivery time for the machines?
For normal machines, the delivery time is 20 days after receiving the deposit. Customized machines should be confirmed with our sales representatives.
How is the after-sales service handled?
We respond immediately to machine breakdowns within 12 hours. If required, we can appoint engineers for on-site installation and worker training.
What is the warranty period for your equipment?
All machines come with a one-year guarantee, excluding wearing parts. We provide broken parts for free during this period, though courier fees are covered by the client.
Do you provide operation training for the equipment?
Yes, we provide both professional on-site engineering support for installation and adjustment, as well as comprehensive online training.
What payment terms do you accept?
We support various payment methods including T/T, L/C, and other standard international trade payment options.

Related Products